Network Water Booster Set
Site Challenge
PolyPump received a request from one of our water authority clients to attend site to review a failing pump which formed part of a network boosting set. The local area in which the pump system fed was experiencing low water pressure during peak times so a solution was required in a timely manner.
On the back of the site survey PolyPump was awarded the project to remove failing pump, install and commission the new pump.
Site Solution
Identifying the faulty pump and looking at modern day more efficient option Polypump were able to source within the client’s tight timeframe and works began.
Pump removed & replaced was the Caprari HVT(Vertical multistage centrifugal pumps) which are typically used in large scale water boosting due to their robust design.
On the back of this successful replacement project, it has prompted other works to be awarded.
Speak with our experienced team
Can’t see what you’re looking for or need a quotation? Get in touch with our team to help with your solutions.